Saturday 10 July 2010

A Little Bit of Pipework


We have made a little progress this past weekend. The floor boards in our bedroom and in the hallway came up so Simon could lay pipework in readiness for changing the passage of water through the house.


The mess was minimal, and the job was relatively small, but it still took up most of the weekend, and did put the size of the whole project into perspective somewhat!


When I say the mess was minimal, it was only minimal upstairs. We had to replace some of the floorboards with the reclaimed floorboards we had stored in the dining/store/workroom. Unfortunately they were behind absolutely everything else and now the dining room looks like it had been struck by a small localised tornado! 
Once it was done though, it felt really good to have started on this next leg of our journey to our finished home.